×
Firstview
Interior view 1
Interior view 2
Exterior view 1
Exterior view 2
Exterior view 3
Exterior view 4
Exterior view 5
Exterior view 6
Plan

Last chance! Newly built 3.5-room ground floor apartment

CHF 495,000.-

Hauptstrasse 51, Meinisberg

Reserved
93 m²
3.5
2
1
1

Description

TheNew construction project in Meinisberg is already underway. This is the last available apartment in the B building! Here, modern 2.5 to 5.5-room apartments are being built in a quiet, child-friendly environment, yet still in a central location. For more detailed information about the project, please visit the project website:

www.neubau-meinisberg.ch.

Living highlights:

Garden area with special usage rights of 75.7m²

Covered seating area of 15m²

Open living and dining room with plenty of natural light

Modern, high-quality kitchen with plenty of storage space

Two spacious bedrooms for flexible living

Bathroom with shower and private laundry tower (washing machine & dryer)

Individual design options:

Floor coverings in the bedrooms can be chosen from: Parquet or vinyl

Living area with high-quality ceramic tiles (optional throughout the apartment)

Interior design can be customized based on individual quotes

Comfort and features:

Ground-floor apartment with private outdoor area

Bright, spacious rooms for maximum living comfort

Private laundry tower with washing machine & dryer

Modern construction with photovoltaic system

Car parking space for CHF 35,000 available

Modern living with design options

Each apartment offers the highest living comfort and can be customized to your individual needs. The interior design is freely selectable, based on individual quotes. In the bedrooms, parquet or vinyl can be installed, while the rest of the living area can be equipped with high-quality ceramic tiles. Those who prefer ceramic tiles throughout the entire apartment can have this implemented at their request. There are additional costs for a consistent parquet floor, as this material is more expensive.

Thoughtful architecture & sustainability

Ground floor apartments with idyllic seating areas and garden areas with special use rights

Balconies & loggias for the other apartments – perfect for relaxing

Solar power plant for sustainable energy supply

Modern construction with energy-efficient and high-quality materials

Location & surroundings

Meinisberg offers an ideal mix of nature and urban accessibility. The quiet residential area is child-friendly, and yet shopping facilities, schools and public transport are within walking distance.

Location & surroundings

The ideal mix of nature and urban accessibility in Meinisberg is child-friendly, and yet shopping facilities, schools and public transport are within walking distance.

Pricing and material and construction quality in general

We were able to keep the very attractive square meter prices from the first project variant despite

price increases, new additional installations and even more high-quality

materials and designs, almost. There are therefore hardly any additional costs for the building,

installations and additional costs passed on to the buyers. As already from

the beginning, the investors are committed to their “line” and philosophy of offering affordable

living space of the highest quality here.

House A:

Roofing: copper

1st floor: Roofing: textile roller blinds

Roofing: wood, painted

Special facade plaster – window sill: artificial stone

Windows: aluminium (plastic-metal windows)

Windows: plastic (plastic-metal windows)

Roofing: wood, painted

Fire protection technology at a higher, exclusive level

New loggias for apartment A6 and A9 (with wooden cladding)

House B:

Roofing: copper

Roofing: wood, painted

Special facade plaster

General information for both buildings:

District heating for best energy efficiency and lowest heating costs

Roof is much larger, more and thus exclusive ceiling height for penthouse apartments

Solar panels

Even more and larger windows

Private shelter room

Part of the facade with charming wooden cladding

More indoor parking spaces

Environment:

More biodiversity and with special requirements of the heritage protection

Environment with even more quality and a pleasant ambience

Start of construction & completion date

The building permit has already been issued. The apartments are expected to be ready for occupation14 to 18 months after the start of construction. Four months before completion, the buyers will receive a binding information on the exact handover date. Use and risk are expected to be transferred to the buyers between the31st August 2026 and the 31st March 2027.

Parking & Purchase Prices

At least one parking space in a covered parking garage is provided for each apartment, which can be purchased for an additional CHF 35,000.-

Conveniences

Neighbourhood
  • Village
  • Green
  • Shops/Stores
  • Bus stop
  • Highway entrance/exit
  • Child-friendly
  • Playground
  • Primary school
Outside conveniences
  • Balcony/ies
  • Terrace/s
  • Quiet
  • Loggia
  • Parking
  • Garage
Inside conveniences
  • Wheelchair-friendly
  • Lift/elevator
  • Open kitchen
  • Cellar
  • Triple glazing
  • With front and rear view
Equipment
  • Fitted kitchen
  • Washing machine
  • Dryer
  • Shower
  • Bath
  • Photovoltaic panels
Floor
  • At your discretion

Distances

 
Public transports
30 m
1'
1'
1'
Primary school
72 m
2'
1'
1'
Stores
81 m
1'
1'
-
Restaurants
288 m
4'
4'
1'

Contact Form

optional